CHC Annual Work Day - May 4, 2024 - 8am - 3pm
VOLUNTEERS NEEDED! INDIVIDUALS, GROUPS & FAMILIES. JOIN US FOR OUR ANNUAL WORK DAY. MANY HANDS MAKE LIGHT WORK. SKILLED AND UNSKILLED PEOPLE NEEDED. FUN FOR ALL. LUNCH PROVIDED.
WORK DAY COORDINATORS WILL GAGE YOUR LEVEL OF INTEREST AND SKILL FOR ANY PARTICULAR PROJECT AND ASSIGN GROUPS AND INDIVIDUALS ACCORDINGLY. THE FOLLOWING LISTS HAVE BEEN PREPARED TO PRIORITIZE WORK AND GAGE LEVEL OF INTEREST FOR ANY PARTICULAR PROJECTS. PLEASE LOOK OVER THE LIST. EMAIL FR. CHRIS WITH ITEMS THAT INTEREST YOU OR YOUR GROUP. WILL DO OUR BEST TO ACCOMODATE INTERESTS.
General Cleaning
CLEAN CABINS 1-4 (UNIT 1) - Vacuum Floor, corners and window sills. Wash windows. Wash mattresses. Vacuum bed frames. Clean lofts. Clean trash cans. List any damage in need of repair.
CLEAN CABINS 5-8 (UNIT 2) - Vacuum Floor, corners and window sills. Wash windows. Wash mattresses. Vacuum bed frames. Clean lofts. Clean trash cans. List any damage in need of repair.
CLEAN CABINS 9-12 (UNIT 3) - Vacuum Floor, corners and window sills. Wash windows. Wash mattresses. Vacuum bed frames. Clean lofts. Clean trash cans. List any damage in need of repair.
CLEAN CABINS 13-16 (UNIT 4) - Vacuum Floor, corners and window sills. Wash windows. Wash mattresses. Vacuum bed frames. Clean lofts. Clean trash cans. List any damage in need of repair.
DEEP CLEAN GAME ROOM - Pay attention to window sills
CLEAN LODGE - Vacuum Floor, corners and window sills. Wash windows. Wash mattresses. Vacuum bed frames. Clean trash cans. Clean bathrooms up & down. Clean Kitchen / Dining Room. Clean Basement Meeting Room. List any damage in need of repair.
CLEAN CHAPEL - Wash Floor. Wash windows. Vacuum Rug. Vacuum window sills. Wash hanging light fixtures.
CLEAN SPIDER WEBS FROM HIGH AND LOW CORNERS IN MAIN GYM
Tree work
CHAINSAW / TREE WORK
WOOD SPLITTING / STACKING
WEED AND GROOM BASEBALL DIAMOND
Moving / unpacking / setup
MOVE BOATS FROM WINTER STORAGE - Kayaks should be moved to the beach area & locked in place.
MOVE BENCHES FROM WINTER STORAGE - Benches should be moved from behind the boat house onto the beach area and prepared for summer use.
ASSEMBLY OF NEW BEDS IN UNIT 4 - Sanding of graphite. Assemble bottom & top bunks. Paint plywood black to hide graphite.
PREPARE SWIM FLOATS FOR INSTALLATION AT BEACH
Unskilled Carpentry Projects
FIX CEILING TILES IN GAME ROOM
REPAIR / INSTALL - LATTICE AND BASE SCREENS AROUND BOTTOM OF CABINS (UNIT 1)
REPAIR / INSTALL - LATTICE AND BASE SCREENS AROUND BOTTOM OF CABINS (UNIT 2)
REPAIR / INSTALL - LATTICE AND BASE SCREENS AROUND BOTTOM OF CABINS (UNIT 4)
INSTALL WINDOW TREATMENTS - CABINS 1-16.
REMOVE OLD GUTTER FROM GYM SIDE
Skilled Carpentry Projects
INSTALL FACIA ON GYM ROOF
EVALUATE LEVEL & SUPPORT OF UNIT 1
REPAIR LEVELING & SUPPORT OF UNIT 2 (CABINS 5-8)
REPAIR LEVELING & SUPPORT OF UNIT 4 (CABINS 13-16)
REMOVE FLAG POLE - FRONT OF CHAPEL. INSTALL NEW TELESCOPING FLAGPOLE IN FRONT OF CHAPEL.
REPAIR WINDOWS IN GAME ROOM
SECURE BUILDING TO PIERS (CABINS 11-12)
INSTALL NEW BACKBOARDS, RIMS & NETS IN GYM
GAS GRILL ASSEMBLY AT LODGE. PERMANENT OUTDOOR GRILL STATION - CONCRETE BLOCKS.
SECURITY CAMERA REPAIR / INSTALL
NEW ROOF ON BACK OF HOUSE / MAIN OFFICE
UPPER WINDOW REPLACEMENT IN GYM
INSTALL NEW DECK ON LODGE
CHAIR RAIL (WOODWORK) INSTALL IN BASEMENT OF LODGE
INSTALL GARAGE DOOR ON BACK OF LODGE
REPAIR SPRING ON SCREEN DOOR IN KITCHEN OF LODGE
INSTALL NEW KITCHEN COUNTER IN LODGE
INSTALL NEW STOVE VENTILATION IN KITCHEN OF LODGE
BUILD GENERATOR HOUSING AT PAVILION BUILDING
CANOE SEAT REPAIRS
REPAIR PUMP HOUSE DOOR
Painting
REPAINT EXTERIOR OF UNIT 1 (CABINS 1-4)
PREPARE, REPAIR BLOCK ON CENTER LEFT SIDE OF GYM. PAINT WITH WATER LOCK PAINT.
PAINT INTERIOR OF CHAPEL.
PAINT EXTERIOR OF CHAPEL.
PREPARE & PAINT HALLWAY ON WAY TO GAME ROOM
Hospitality for Work Day
LUNCH
WORK DAY SIGN IN STATION
WATER / COFFEE
WORK GLOVES